HomeServicesPost-Construction Cleanup

Post-Construction Cleanup
Las Vegas & Clark County

Final phase construction cleaning for commercial projects in Las Vegas. We coordinate with general contractors, respect site access protocols, and get your facility move-in ready on schedule.

What’s Included

  • Construction dust removal from all surfaces
  • Interior window and glass washing
  • Debris and construction waste removal
  • Adhesive label and sticker removal from windows and fixtures
  • Hard surface polish and shine-out
  • HVAC vent and diffuser cleaning
  • Restroom deep clean and disinfection
  • Floor cleaning and surface prep
  • Touch-up cleaning after punch-list walk
  • Final inspection ready documentation

The Final Phase That Determines First Impressions

Construction cleanup is the last step before a space becomes operational — and it sets the tone for every impression that follows. Fine construction dust, adhesive residue, paint overspray, and debris left from trade work can delay occupancy, damage new finishes, and create air quality issues if not properly addressed.

Sentrix post-construction cleanup teams are experienced working alongside general contractors, interior designers, and property managers during the final phase of commercial projects in Las Vegas. We understand site logistics, access requirements, and the precision needed to clean a brand-new facility without damaging new finishes.

Phases of Construction Cleanup

Rough clean: Performed during construction to keep active work areas manageable. Debris removal, broom sweep, and basic surface prep.

Final clean: Performed after all trades have completed. This is the comprehensive, detail-oriented clean that prepares the space for occupancy or punch-list inspection.

Touch-up clean: Performed after punch-list walk and any final trade work. Quick targeted clean to address specific areas before certificate of occupancy or tenant move-in.

Large-Format and Phased Projects

Sentrix handles post-construction cleanup for facilities from 1,000 to 100,000+ square feet. For multi-phase tenant improvement projects and large commercial builds, we coordinate directly with your project manager and GC to schedule access around the construction timeline.

Frequently Asked Questions

How long does post-construction cleanup take?
Timing depends on facility size and condition. A 5,000 sq ft office build-out typically requires 1–2 days for final clean. We provide an estimated timeline with every quote.
Do you coordinate with the general contractor?
Yes. We work directly with GCs and project managers to schedule around construction activities, access restrictions, and project timelines.
Can you remove construction materials and debris?
We handle construction dust, debris, and disposable materials. Bulk material removal (drywall, lumber, fixtures) should be handled by the GC prior to our clean.
Do you provide a certificate of cleaning for new tenants?
Yes. We provide documented service logs that detail what was cleaned, what products were used, and when the service was completed.
What is the difference between final clean and move-in clean?
Final clean prepares the space for punch-list and occupancy inspection. Move-in clean is performed immediately before tenants or occupants take possession — a detailed, white-glove standard clean.

Ready to Discuss Your Facility?

Get a custom quote — no obligation. We respond within 2 business hours.

Get a Free Quote Call (702) 850-1575